  • 2016 - 273 000 m3 sawn goods.
  • 2015 - 268 000 m3 sawn goods.
  • 2014 - 253 000 m3 sawn goods.
  • 2013 - 245 000 m3 sawn goods.
  • 2012 - 235 600 m3 sawn goods. Step 3 of the investment programme has been successfully finalised, with installation of a new reducer bandsaw and a new edger.
  • 2011 - 276 000 m3 sawn goods. Step 2 of the investment programme has been successfully finalised according to plan, with installation of a greensorter in two different lines for sideboards and centrepieces including new packaging stations.

  • 2010 – 281 000 m3 sawn goods. An investment programme was started that will be completed, in 3 steps, between 2010 and the summer of 2012. These 3 steps are:
    1. In 2010 an extension of the sawmill was completed as well as the installation of 5 new kilns (4 chambers and 1 progressive kiln)
    2. In 2011 2 new greensorters, including new packaging stations, will be installed and connected to the existing production line
    3. In 2012 improvements to the sawmill line will be made. A new reducer bandsaw, and a new edger for sideboards, will also be installed.

  • 2009 – 273 000 m3 sawn goods.

  • 2008 – 253 000 m3 sawn goods. A new log sorting line built (SPRINGER MASCHINENFABRIK AG).

  • 2007 – 253 000 m3 sawn goods. A Linck automatic log turning and centering device with 3D-scanner were installed in front of the reducer band-saw.

  • 2006 – 252 000 m3 sawn goods.

  • 2005 – 272 000 m3 sawn goods. Sword saw HOLTEC installed.

  • 2004 – 234 000 m3 sawn goods. Loading plate for containers installed and next storage house built.

  • 2003 - 188 000 m3 sawn goods. Linck line in operation since February.

  • 2002 - 122 000 m3 sawn goods. New boiler with 8MW, two 2-zone OTC dryers and assembly of Linck sawing line started.

  • 2001 - 121 000 m3 sawn goods. Additional 4 drying cambers built.

  • 2000 - 106 000 m3 sawn goods. Built a new grading mill and third storage house.

  • 1999 – 90 000 m3 sawn goods. Increased drying capacity by 4 chambers.

  • 1998 – 66 000 m3 sawn goods. Another storage house built.

  • 1997 – 33 000 m3 sawn goods. The first production year.

  • 1996 – Building, assembling of equipment, training people in Mother Company in Sweden.

  • 1995 – December building activities began






Click to enlarge